Blog on demolition and strip-out works
Plain texts on what is most often underestimated in a demolition: paperwork, volume, waste and asbestos.
Renovate or demolish? How the decision is made
Choosing between a renovation and a demolition is not about affection for an old house but about a handful of measurable things. Here they are.
Why demolition is priced per cubic metre and how to work the volume out
A square metre of footprint says almost nothing about the price of a demolition. Why volume is what counts, and how to estimate it yourself.
The demolition design: what the documentation contains and who prepares it
Documentation for removal of a structure is the ticket to a permit. What belongs in it and why the demolition company does not write it.
Asbestos in an old building: how to spot it and why it has its own regime
Cement sheeting, pipe lagging, old ceilings. Where asbestos turns up and what it means for a demolition.
Demolishing a bathroom core: the sequence and what to watch out for
Panel and masonry cores, risers, the owners association and the rubble that has to come down from the third floor.
Want a price and a date for a specific building?
Send the address, a few photos and one sentence about what has to go. We fill in the rest with questions, not guesswork.