Demolice 24 775 654 443

Asbestos in an old building: how to spot it and why it has its own regime

Demolice 24, November 2026

Asbestos is not a reason to panic, but it is a reason to change the procedure. In buildings from the second half of the twentieth century it is assumed to be present until proven otherwise. For a demolition that means one thing: it is dealt with separately, in advance, and by a company authorised to do it.

Where asbestos turns up most often

  • Corrugated and flat roofing sheets of asbestos cement, and facade cladding made of them.
  • Lagging around pipes and boilers, sprayed coatings on structures.
  • Some suspended ceilings, partition boards and fire-protection linings.
  • Old floor coverings and the adhesives underneath them.
  • Drainage and ventilation pipes made of asbestos cement.

Why it has its own regime

Asbestos waste is hazardous waste, and handled without care the fibres are released into the air. Work with it is therefore notified in advance to the regional public health authority and carried out by a company with the right equipment and authorisation. A structure containing asbestos also requires a removal permit under Building Act No. 283/2021 Coll. and cannot be removed under the simplified route.

What it means for the course of the job

  • A suspicion of asbestos is stated in the application for the removal permit.
  • Asbestos is removed first, separately, before ordinary demolition starts.
  • A separate quote and a separate hazardous waste disposal document arise.
  • The timing of the whole job shifts. Count on that in advance, not at signing.

What we do and what we do not

We do not carry out asbestos removal ourselves. If asbestos is in your enquiry or we come across it, we say so and handle it separately with a company authorised for it. The worst version is the one where the cement sheeting is discovered on the day the excavator is already standing on the plot.

That is why we ask right in the enquiry: if you have an asbestos cement roof, old lagging around pipes, or you simply are not sure, write it down. Details of the paperwork side are on permits and documentation.

Want a price and a date for a specific building?

Send the address, a few photos and one sentence about what has to go. We fill in the rest with questions, not guesswork.

Request demolition